Our clients are some of the leading players in the UK retail, construction and civil engineering industries. We also work with developers, housing associations, local authorities, loss adjusters, consultants and main contractors.
New Housing Development, Linwood
20,000 cubic metres of soil remediated for re-use on site; 500,000 litres of contaminated water successfully treated; Ambient air quality standards maintained throughout.
Residential Property Sale, Inverness
ERS adopts an intergrated approach to achieve efficient solutions for this private client.
Chromium Contaminated Groundwater, Central Belt
Design and operation of a remotely-operated groundwater treatment plant at this former industrial site, to be redeveloped as public amenity space. Design awarded "Most Innovative Chemical Treatment", Brownfield Briefing Awards 2007.
A bespoke in situ bioremediation system installed beneath new building footprint enables site regeneration to proceed, whilst ensuring that remediation will continue post-build without the need for additional intrusive work.
Site investigation for biomass plant development
Multiphase site investigation in support a planning application for the development of a new biomass plant on a former aluminium smelting site.
Site investigation for the M74 motorway extension
ERS successfully completes 100 boreholes using a highly flexible rotary-sonic drilling system to allow continuous shallow-deep investigation and simultaneously obtain environmental and geotechnical information, with minimum disturbance to contaminated site zones.